Red Stone Drilling
Riverside  House
Riverside Drive
Aberdeen, AB11 7LH
Tel: +44(0)1224 739189

view this site in Spanishview this site in Spanish 

 
          

    +  Home

    +  Well Project Management
        -  Red Stone approach
        -  Operating Areas
        -  Projects

    +  Drilling Advisory Function

    +  Well Performance Management

    +  Consultancy Services

    +  Vacancies

    +  Latest News

    +  Links

    +  Corporate Governance

    +  Contact us

 
Red Stone Approach

Red Stone Drilling's approach to well project management covers all aspects of the well from concept to production. Our approach is designed to assist small independent operators who maybe embarking on their first exploration. well or for larger operators with high operation activity and a lack of available resources.

Red Stone Drilling can assist with:

  • Conceptual and detailed well design.
  • Rig site selection.
  • Rig selection, inspection and acceptance.
  • Equipment procurement.
  • Well Project Management Documentation.
  • Operational management.
  • Cost engineering and AFE preparation.
  • Contract design and management.
  • Legislative requirements.
  • Third party services tendering and selection.
  • Logistics.

Red Stone Drilling has the in-house experience to use 'SideKick', a state-of-the -art gaskick simulator developed by Schlumberger. Sidekick is widely used in the industry to analyse well control events and during the planning phases of HP/HT wells.

 


 
    Download Corporate Brochure
    Download Consulting Brochure
    info@redstonedrilling.com
   

 © 2007 Red Stone Drilling. All Rights Reserved